
Facade Finishes, Modi'in
Project description:
In a post-construction finishing project in Modi’in, we carried out comprehensive finishing works on three buildings before occupancy, keeping to a tight schedule and precise execution requirements. The project included high-grade Sika joint pointing, facade cleaning over more than 5000 square meters, and the meticulous replacement of 1200 stones, with an emphasis on precision and on preserving the integrity of the building. During the work we treated hundreds of segregations, matched perfectly to every requirement, and made all the adjustments needed to upgrade the quality of the building.
The work on site involved close coordination with dozens of contractors and professionals, to ensure the flawless execution of every stage and a precise, continuous flow of work. All this while keeping high safety standards in the finishing works, which were essential not only for the workers’ wellbeing but also for the integrity of the site and its surroundings. The teams worked in perfect cooperation and close coordination, with care for quality and precision in every single detail.
Thanks to our experience and professionalism, we met the tight schedule and delivered an excellent result, reflected in an upgrade of the building’s overall appearance, while keeping a high quality and strict standards. This project reflects our ability to handle complex challenges and to deliver creative, innovative solutions in finishing works, even in challenging conditions.









