Projects we have completed
Migdal Ilit
The Migdal Ilit project is a landmark in Israel's work-at-height industry, one of the largest and most complex engineering and operational undertakings carried out in the field. In the project our company deployed more than 30 rope-access technicians working simultaneously on several facades of a 30-story tower, to deal with safety hazards and dismantle dangerous exterior elements. The complexity of the project stemmed from several major factors, chief among them the direct hit the building took during […]
Ceiling Restoration with Traverses
In this complex project we had to replace 500 square meters of ceiling on the 19th floor, using the traverse method to deal with difficult access and unreachable work points. With 3,000 temporary bolts, safety nets and careful coordination with all the parties, we carried out the task with precision, professionalism and maximum safety, because in complex projects Top Gova is the leading choice.
Buyer's Price housing, Rosh HaAyin
In this project we had to deal with more than 100 sources of damp found in several buildings of the Buyer's Price housing program in Rosh HaAyin. The buildings included both precast construction and the Baranovich method, and each method had different waterproofing challenges that called for tailored solutions.
Halomot Hadera
Restoration and waterproofing at height at the "Halomot Hadera" project. At the "Halomot Hadera" project, 80 sources of damp and segregation in the concrete were found, which were harming the building's durability. The treatment included precise detection, concrete repair and exterior waterproofing at height, without scaffolding. The result: a protected, durable building that will stay stable for years.
Harish HaMagaf
At the "Harish HaMagaf" project, the Top Gova team detected and treated damp spots, carried out segregation checks, restored concrete and reinstated stones. The work was done according to the requirements of the standard, with strict attention to safety and maximum quality.
Modi'in Moreshet Yahalom
Restoration and waterproofing in the “Moreshet Yahalom” project in Modi'in The new “Moreshet Yahalom” buildings received immediate post-construction treatment, including advanced waterproofing, strengthening of the building envelope and exterior cladding repairs, to prevent future failures. The work was done at height, with no need for scaffolding, and gave the buildings high durability, protection against water penetration and lasting aesthetic preservation
Givatayim City: curtain wall replacement
We recently completed a unique project at Givatayim City, which included replacing curtain walls and advanced waterproofing with butyl tape. The work took place in a challenging setting, inside an occupied building, which called for careful planning, precise execution and full consideration for the routine of the building's residents and users.
Gindi Towers
Cosmetic restoration at the Gindi Towers At the Gindi Towers, cosmetic work was carried out at height to improve the building envelope, including cladding repairs, restoration of worn areas and precise painting. The work was done without scaffolding, preserving the buildings' luxurious look and without disturbing the residents. The result: uniform cladding, an impressive appearance and improved long-term durability.
New Rehovot
In the project we treated damp spots professionally, in cooperation with the other parties on site. Working in an occupied neighborhood called for daily briefings of the rope-access teams, to ensure quiet, precise work. We kept the site clean throughout the process, which ensured a quality result and the clients' full satisfaction.
HaTseirim Towers, Tel Aviv
In the HaTseirim Towers project, Top Gova planned the work carefully to minimize disturbance to the surroundings. The teams worked quietly and with focus, with an emphasis on safety and cleanliness. The project included concrete repairs in hard-to-reach locations and under complex loads, with strict quality control and compliance with the company's high standards.
Unik Urban, Be'er Ya'akov
At the Unik Urban project, Top Gova carried out work at height while keeping the residents' daily routine, the work area clean and the residential area pleasant. The rope-access teams worked in full coordination with the parties involved, and provided professional solutions to every challenge. Thanks to extensive experience, we gave the residents a high-quality living experience with a sound, durable and impressive building.
Buyer's Price housing, Rishon LeZion
At the "Buyer's Price" housing project in Rishon LeZion, Top Gova treated 60 damp spots in precast buildings, using advanced technologies and high-quality waterproofing materials. The work included locating the sources of damp, thorough repairs and keeping to the safety rules. The challenges of precast construction called for tailored solutions, while keeping the site clean and the disturbance to the residents low. Thanks to Top Gova's experience, the result is a dry, safe and pleasant place to live.
I Ranana, Ra'anana
Restoration and waterproofing at the I Ra'anana project. At the I Ra'anana project we carried out cladding repairs, crack sealing and an aesthetic upgrade of the building envelope, to prevent future wear and preserve its luxurious look. The work was done at height without scaffolding, with maximum precision and while keeping the residents' daily life undisturbed. The result: a strengthened, attractive envelope that will last for years.
Ein Karem, Jerusalem
Restoration and waterproofing in the Ein Karem project, Jerusalem In the Ein Karem project, cladding restoration, crack repairs and advanced waterproofing were carried out, dealing with complex terrain and an extreme climate. The work was done at height without scaffolding, with an emphasis on preserving the architectural style and improving the building's long-term durability. The result: a stable, protected building that blends perfectly into the Jerusalem landscape.
Narkisim, Rishon LeZion
In the "Narkisim" project we carried out complex rope-access works, including drilling and lateral traverses on exterior walls. The aluminum cladding around the window was dismantled and professional Sika waterproofing was applied around the windows. The work was done meticulously and with a high level of safety, with absolute precision. The Top Gova team left the building strengthened, watertight and safe for many years.
Glil Yam, Herzliya
At the Glil Yam project in Herzliya, Top Gova carried out restoration and maintenance work, including treating damp spots, securing tiles, sealing cracks and cosmetic improvements to the facades. The work was done with advanced rope-access equipment and high-quality waterproofing materials, with emphasis on keeping the residents' routine and the site clean. The project was completed to the clients' satisfaction, with buildings that are safe and will last.
Unik VIEW, Petah Tikva
At the Unik View project, Top Gova treated damp spots, secured tiles, sealed cracks and made cosmetic repairs in luxury buildings. The work used rope-access equipment and cranes, keeping the residents' routine, the site clean and the schedule. The project was completed to the clients' satisfaction, with safe, dry and impressive buildings.
Life Unik, Yehud
Envelope restoration at the Life Unik project, Yehud. During the work at Life Unik Yehud we found segregation in the concrete and fallen plaster at complex points at height, which called for a thorough restoration and waterproofing of the envelope. The treatment included strengthening the concrete, repairing the plaster and restoring hazardous areas, all with the greatest precision and without scaffolding. The result: a strengthened, safe building that will last.
Karmei Gat
In the Karmei Gat project, Top Gova treated damp spots, waterproofed facades, strengthened tiles and carried out cosmetic repairs on high-rise buildings. The work used high-quality waterproofing materials and combined advanced technologies with rope-access equipment. Top Gova's teams worked while preserving the residents' routine, cleanliness and safety. The project was completed to the clients' satisfaction and delivered safe, dry buildings with an upgraded appearance.
Gindi Beit BaPark, Or Yehuda
At the "Gindi Beit BaPark" project, Top Gova treated 100 damp spots in precast buildings with five rope-access teams. The work included precise detection and repair, advanced waterproofing solutions and adaptation to precast buildings, while keeping to safety, cleanliness and the schedule.
Neot Shamir, Ramla
In the Neot Shamir project in Ramla, Top Gova treated damp spots in occupied buildings, with consideration for the residents' daily routine and full coordination with the surroundings. The work included locating and repairing the sources with advanced technologies and high-quality waterproofing materials, while keeping the site clean and safe. The project highlights the company's ability to combine professionalism and meticulous service in complex environments, and was completed to the residents' satisfaction.
Ono Valley, Kiryat Ono
At the luxury Ono Valley project, Top Gova renovated and waterproofed 30 apartments, finding defects, treating damp spots and making cosmetic repairs. The work was done by skilled rope-access teams, with advanced waterproofing materials and methods adapted to each apartment's particular needs. The project was carried out keeping the site clean, with consideration for the residents and on schedule, and highlighted Top Gova's commitment to professional solutions and quality service
Space, Tirat Carmel
In the Space project in Tirat Carmel, Top Gova treated 150 damp spots in a building built with the Baranovich method over about half a year. The work included locating and repairing the sources with advanced technologies and high-quality waterproofing materials. Three rope-access teams worked while preserving the residents' routine, cleanliness, safety and the schedule, underlining a commitment to excellence and customer satisfaction.
HaShahar HaOle, Dimona
Restoration and waterproofing at the "HaShahar HaOle" project. The project included strengthening, restoration and waterproofing work to improve the building's durability in the desert climate. The work included repairing cracks, renewing the cladding and advanced waterproofing, using work-at-height methods. The result: a strengthened, attractive building that will last.
Harish Parsa, general
At the Harish Parsa project, Top Gova carried out advanced work at height that included treating damp spots, securing tiles and cosmetic repairs to the buildings' facades. The project was carried out on tall, complex buildings, using advanced rope-access equipment and precise working methods to ensure excellent results.
Yehuda Amichai
At the Yehuda Amichai project, Top Gova dismantled the aluminum cladding around the building's entire perimeter and thoroughly treated the sources of damp found behind it, all with 8 professional teams and an experienced site manager. The work was done in an orderly, high-quality way, keeping the residents' daily routine and meeting the highest standards.
Achdut Tower Project
In the project at the Achdut Tower in Tel Aviv, more than 2000 aluminum elements were installed in advanced rope-access works, using solutions tailored to each stage of the project. The teams worked in close cooperation, with care for precision, safety and the schedule, despite the challenges of the height and the complex requirements.
Facade Finishes, Modi'in
In a post-construction finishing project in Modi'in, comprehensive finishing works were carried out on a building before occupancy, including high-grade Sika joint pointing, facade cleaning and the replacement of 1200 stones, along with the treatment of hundreds of segregations. The work involved close coordination with dozens of contractors and professionals, while keeping a high level of safety on site. The teams worked in close cooperation, meeting a tight schedule and ensuring a perfect result, with an emphasis on quality, precision and creative solutions in finishing works.
Viva Hadera
In the "Viva" project in Hadera, Top Gova professionally treated more than 100 damp spots in 80 apartments in occupied buildings, using advanced technologies and in full coordination with the residents. The work was done to the highest standards, with skilled teams and a dedicated site manager, who ensured a perfect result and full satisfaction.