Project description:
At the Harish HaMagaf project, Top Gova carried out rope-access work that included detecting and sealing damp spots
The work began with a comprehensive segregation check, which identified areas where the materials in the concrete had separated. After the problem points were marked and documented, the concrete restoration began: removing loose layers of concrete, cleaning the surface thoroughly and applying advanced restoration materials to strengthen the concrete, improve its durability and ensure maximum protection. In the next stage, the stones were reinstated: they were sorted and cleaned, reattached and bonded firmly, with careful alignment and a uniform finish so that the building keeps its original look. Throughout the process special emphasis was placed on meeting strict safety standards, coordinating all the work teams and keeping the work precise and of high quality.
All the work was done according to the requirements of the standard and the high standards of Top Gova.
The client received a high-quality, durable and safe solution, with a precise finish.
The project was completed successfully, with the schedule met, maximum safety and full coordination with the site’s parties.