  • Teams: 308
  • Project location: Yehuda Amichai
  • Work time: 5 months

Project description:

The Yehuda Amichai project: professionalism and challenges at height

At the Yehuda Amichai project, Top Gova carried out a complex, challenging task: dismantling the aluminum cladding along the building’s entire perimeter and treating the damp found behind it. The work was done by 8 professional teams and an experienced site manager, keeping the residents’ daily routine and dealing with the challenges of an occupied setting.

How did we work?

  • Precise planning: every stage of the work was carefully planned, including dismantling the cladding and thoroughly treating the sources of damp found behind it, to ensure a durable, high-quality result.
  • Thorough restoration: after the aluminum was dismantled, we treated the sources of damp with advanced materials and professional waterproofing techniques, which ensured full prevention of water penetration in the future.
  • Orderly, coordinated work: the site manager supervised every stage of the project, with full coordination between the 8 teams, which ensured uniform, high-quality work in every part of the building.
  • Service with sensitivity to the residents: we worked at set hours, kept the surroundings clean and tidy, and kept the residents informed at every stage of the process.

The final result

At the end of the project, the aluminum cladding had been dismantled successfully, the sources of damp fully treated, and the building returned to excellent condition, in look and in function. The residents enjoyed a quiet, well-managed daily routine throughout every stage of the work.

The Yehuda Amichai project is an excellent example of Top Gova’s ability to carry out complex projects at height, with uncompromising professionalism and consideration for the needs of the client and the residents.