
Space, Tirat Carmel
Project description:
The Space project, Tirat Carmel
In the Space project in Tirat Carmel, Top Gova took on the treatment of 150 damp spots in a building built with the Baranovich method. The project, which spanned about half a year, called for precise planning, professional execution and full coordination between three experienced rope-access teams working at height on the building.
The Baranovich method, which characterises the construction in the project, posed unique challenges that call for tailored solutions. Top Gova’s teams focused on locating the sources of dampness and repairing them, using advanced technologies and high-quality waterproofing materials, with the aim of ensuring long-term durability.
Throughout the project we preserved the residents’ daily routine and a clean, orderly work environment. The works were carried out under strict safety rules, with minimum disturbance to the surroundings and an emphasis on preserving the building’s appearance and the quality of the work.
Top Gova’s extensive experience in work at height and in waterproofing allowed us to complete the project with great success, meeting the schedule and the highest standards. The Space project is a testament to our commitment to excellence and customer satisfaction, and joins the long list of successful projects across the country.














