HaShahar HaOle, Dimona

  • Teams: 71
  • Project location: Emanuel Moreno
  • Work time: 5 months

Project description:

Restoration and waterproofing at the “HaShahar HaOle” project, Dimona: durability in extreme climate conditions

Background:

The “HaShahar HaOle” project in Dimona needed comprehensive restoration and waterproofing work after significant cracks, crumbling cladding and water penetration into the building envelope were found.
The main challenge was dealing with the desert climate: extreme heat, sharp temperature swings and strong winds, which had worn the cladding and damaged the integrity of the waterproofing.

The project’s challenges:

✔ Extensive cracks in the envelope: damage caused by extreme temperature changes and long exposure to the sun.
✔ Fallen plaster and crumbling cladding: natural wear of the building’s outer layers.
✔ Faulty waterproofing that let water in: despite the dry climate, seasonal rain seeped through weakened areas and caused damp damage.
✔ Work at height with challenging access: the need for precise treatment, without cumbersome scaffolding.

The solution:

🔹 Repairing and strengthening cracks: elastic sealants that withstand extreme temperature swings.
🔹 Restoring the outer cladding: removing crumbling layers, replacing damaged plaster and applying a strengthened layer.
🔹 Advanced waterproofing: applying an innovative protective layer for maximum resistance to wear and the weather.
🔹 Work at height by rope access: an efficient, fast and economical solution that suited the site’s conditions.

The result:

✅ A strengthened building that withstands the desert’s extreme climate changes
✅ A full restoration of the building envelope, including cladding and waterproofing repairs
✅ Prevention of water penetration and future wear
✅ The building’s aesthetics preserved and improved, with precise work at height

The “HaShahar HaOle” project in Dimona is an excellent example of the importance of maintenance and restoration work in extreme weather conditions, using advanced technologies to improve the building’s durability over time.

Summary:

Restoration and waterproofing at the “HaShahar HaOle” project, Dimona

At the “HaShahar HaOle” project in Dimona, cracks were repaired, the cladding renewed and advanced waterproofing applied to cope with the desert climate.

The work was done at height without scaffolding, with a comprehensive strengthening of the building envelope for long-term durability. The result: a stable, attractive building that withstands changes in the weather.