Narkisim, Rishon LeZion
Project description:
In the “Narkisim” project we carried out complex, two-stage rope-access works, including drilling and lateral traverses on exterior walls.
Our team handled challenging tasks at height, maintaining a high level of safety and using advanced techniques to ensure stability at every stage of the work.
Part of the work involved precise lateral manoeuvring on a building’s exterior walls, which required exceptional skill and experience.
Around the window, the existing aluminum cladding was dismantled and the team carried out professional, meticulous waterproofing. With high-quality waterproofing materials, comprehensive sealing was achieved around the windows to prevent water penetration and to strengthen the building structurally and in durability. After the dismantling, waterproofing was applied under the window frame, and then the cladding was put back in place with an additional waterproofing layer on the outside, which ensured the best durability over time.
Thanks to the professionalism, precision and experience of the Top Gova team, every task was carried out thoroughly and with attention to the small details. The project was completed successfully and left the building strengthened, watertight and safe, while keeping to strict safety standards and a high quality that delivers a perfect result for many years.