Skip to content
039633399

Ono Valley, Kiryat Ono

  • Teams: 2
  • Project location: Levi Eshkol
  • Work time: 1 month

Project description:

The Ono Valley project

At the luxury Ono Valley project, Top Gova treated 30 apartments as part of advanced renovation and waterproofing work. The project included finding defects and professionally repairing a range of problems, with particular emphasis on treating damp spots and cosmetic repairs in the buildings.

Thanks to our skilled rope-access teams, we were able to meet unique challenges and carry out the work quickly and precisely. The work used advanced waterproofing materials and methods adapted to each apartment’s particular needs, which ensured long-term durability and a high-quality result.

Throughout the project we made sure to keep the work area clean and tidy, with full consideration for the residents’ daily routine. The work was carefully coordinated with the project’s management to make sure the schedule was met and every party involved was fully satisfied.

The Ono Valley project joins Top Gova’s list of leading projects, and highlights our commitment to professional, precise solutions alongside quality service and a personal approach to every client.